Buried alive
by fabric. In the past two weeks, I've cut up 24 yards of linen, 25 yards of muslin, and and 18 yards of various and sundry tunic material. Out of that I've made 24 linen veils, 24 muslin veils, and 3 tunics. I have another 3 to finish, plus make some new garb for V before the 3rd of August.
V is in high stress mode, as he still has tons of belts to get done, with about 1/2 of them needing to be shipped by tomorrow.
There are times I really hate Pennsic.
V is in high stress mode, as he still has tons of belts to get done, with about 1/2 of them needing to be shipped by tomorrow.
There are times I really hate Pennsic.